2. Machine Startup and Shut Down

2.1 System Startup


After power to the system is turned on, the power indicator of the hand-held box come on and it will enter the startup procedure. If system upgrade took place before previous shut down, system upgrade will be implemented during this startup, requiring additional time. The screen will display "System Update" with an animated arrow running upward.

Startup process flow